Assignment from
Period of Assignment
Technical Assistance |
Pakistan Textile
City Limited (PTCL)
2009-2013
|
Pakistan Textile City Limited (PTCL),
with a gross area of about 1250 acres is located at Port Qasim
Karachi. PTCL has decided to undertake, parallel to the other
infrastructure facilities, the construction of a Combined Effluent
Treatment Plant (CETP) and Solid Waste Management, for the
industrial city, at an already allocated site. The treatment
capacity of plant is around 84,000 m3/day. The proposed Combined
Effluent Treatment Plant Site with an area of 24 acres is designated
within the estate.
COMPONENTS
Basic Secondary Data Collection
Feasibility Study Report
Detailed Engineering design and tender-contract documents
Tender contract documents
Engineer’s Cost Estimate
Process Design Report
Construction Drawings
Operational and Maintenance Manual
Contractor’s Pre-qualification Services
Bid Evaluation Services
Top Construction Supervision Services
Supervision of Plant Start-up and Commissioning
Solid Waste Management Scheme
Feasibility for reuse of treated wastewater |