| COMBINED
EFFLUENT TREATMENT PLANT FOR FAISALABAD INDUSTRIAL ESTATE |
Assignment from
Period of Assignment
Technical Assistance
|
Faisalabad Industrial Estate
Development and Management Company
2008- On going
Faisalabad Industrial Estate Development and Management Company
|
Faisalabad Industrial Estate Development & Management Company (FIEDMC),
with a gross area of about 1523 hectares, is located adjacent to M-3
Motorway at a distance of 22KM from Faisalabad. FIEDMC has decided to
undertake, parallel to the other infrastructure facilities, the
construction of a Combined Effluent Treatment Plant (CETP) and Solid
Waste Management, for the estate, at an already allocated site. The
treatment capacity of plant is around 400,000 m3/day. The
proposed Combined Effluent Treatment Plant Site with an area of 24.84
hectares is designated within the estate.
COMPONENTS
-
Basic Secondary Data Collection
-
Physical and topographical surveys
-
Subsoil surveys and geo-technical Investigation
-
Feasibility Study Report
-
Initial Environmental Examination
-
Detailed Engineering design and tender-contract documents
-
Tender contract documents
-
Engineer’s Cost Estimate
-
Process Design Report
-
Construction Drawings
-
Operational and Maintenance Manual
-
In-house Pollution Reduction Measures (IPRM) Guideline Manual
-
Contractor’s Pre-qualification Services
-
Bid Evaluation Services
-
Construction Supervision Services
-
Supervision of Plant Start-up and Commissioning
-
Solid Waste Management Scheme |