| COMBINED
EFFLUENT TREATMENT PLANT FOR KORANGI CREEK INDUSTRIAL PARK |
Assignment from
Period of Assignment
Technical Assistance
|
National Industrial Parks
Development and Management Company
2008-On going
National Industrial Parks Development and Management Company,
Karachi
|
Korangi Creek Industrial Park (KCIP), a project of National Industrial
Parks (NIP) Development and Management Company, with a gross area of
about 250 Acres, is located at a travel distance of about 22
Kilometer, from Karachi Sea Port, Karachi. Presently different
infrastructure facilities including roads, water supply works and
sewerage and drainage works are being constructed at KCIP. NIP has
decided to undertake, parallel to the other infrastructure facilities,
the construction of a Combined Effluent Treatment Plant (CETP), for
the estate, at an already allocated site, located in the north of the
Park. The treatment capacity of plant is around 16,000 m3/day
[3.55MGD]
COMPONENTS
-
Process Designing
-
Environmental Impact Assessment (EIA)
-
Preparation of Tender Documents
-
Preparation of Detail Construction Drawing
-
Supervision of Construction and Installation Drawings
-
Supervision of Commissioning and Training of Operation Staff
Post Commissioning Back Support.