Theme
NEC Consultants

  |   HOME  |    SITEMAP   |   MEMBERS LOGIN |

 
NEC Consultants - Leading environmental engineering consulting firm
          HOME                  ABOUT US                   SERVICES                   CAREER                    PROJECTS                  CLIENTS                 CONTACT US  


 PROJECTS
 

 

  NEC Projects - Mega Projects
 COMBINED EFFLUENT TREATMENT PLANT FOR KORANGI TANNERIES–PHASE I
Assignment from
Period of Assignment
Technical Assistance
 
PTA Environmental Society (SZ)
1996-1999
PTA Environmental Society (SZ)
 

 
Pakistan Tanners Association initiated comprehensive environmental management program in 1994. Implementation of cleaner Technologies in individual tanneries, implementation of comprehensive solid waste management for tannery solid waste and construction of combined effluent treatment plant (CETP) were major component of the program.

Phase-I of the project was to establish feasibility of each cleaner technology option, develop guidelines for establishment of solid waste management in the sector, evaluation of treatment options available for the tannery cluster.


COMPONENTS
 Topographical survey and profile of Project area
 Soil Investigation
 Feasibility Studies
 Preliminary design of Wastewater conveyance system and treatment plant
 Preliminary design and drawings
 Preliminary cost estimates
 Preliminary Occupational Health and Safety Plan
 Preparation of Policy Development Plan
 Pilot scale study on UASB technology for treatment of tannery wastewater


 

 
Theme


HEAD OFFICE

Perfect Site, 21 KM Off: Ferozepur Road, Near Masjid-e-Ibrahim, Lahore - Pakistan
Tel: +92(0)42 5274527 – 30, Fax: +92(0)42 5274526  Email: necnorth@nec.compk

Copyright 2004-2007 NEC Consultants (Pvt)Ltd. 
Web Site is best viewed in 1024X768 Resolutions, with MS Internet Explore