| COMBINED
EFFLUENT TREATMENT PLANT FOR SUNDER INDUSTRIAL ESTATE
|
Assignment from
Period of Assignment
Technical Assistance
|
Punjab Industrial Estates
(Development and Management Company)
2005-2007
Punjab Industrial Estates (Development and Management Company)
|
Sundar Industrial Estate (SIE), a project of Punjab Industrial Estates
(PIE) Development and Management Company, with a gross area of about
540 hectares, is located at a travel distance of about 26 kilometers,
from Thokar Niaz Baig, Lahore. Presently different infrastructure
facilities including roads, water supply works and sewerage and
drainage works are being constructed at SIE. All the industrial plots
have already been allotted to the applicant industries. PIE has
decided to undertake, parallel to the other infrastructure facilities,
the construction of a Combined Effluent Treatment Plant (CETP), for
the estate, at an already allocated site, located in the south of the
estate. The treatment capacity of plant is around 200,000 m3/day [200
MLD]
COMPONENTS
-
Basic Secondary Data Collection
-
Physical and topographical surveys
-
Subsoil surveys and geo-technical Investigation
-
Feasibility Study Report
-
Initial Environmental Examination
-
Detailed Engineering design and tender-contract documents
-
Tender contract documents
-
Engineer’s Cost Estimate
-
Process Design Report
-
Construction Drawings
-
Operational and Maintenance Manual
-
In-house Pollution Reduction Measures (IPRM) Guideline Manual
-
Contractor’s Pre-qualification Services
-
Bid Evaluation Services
-
Construction Supervision Services
-
Supervision of Plant Start-up and Commissioning
|