  NEC Projects - Environmental uplift Program For Korangi Industrial Area
 

PROGRAM PROJECT

 

ENVIRONMENTAL UPLIFT PROGRAM FOR KORANGI INDUSTRIAL AREA

INITIAL ENVIRONMENTAL EXAMINATION

 

 

 

OBJECTIVE OF IEE

 

To prepare a detailed assessment document of environmental and socioeconomic impacts attached to the implementation of the program for the benefit of labor force in KIA, communities in Korangi locality and overall ecology of the area. The document could be further developed in the detailed Feasibility Report. KIA: Industrial (Sectors: 5,7 ,14,to 29, 30,38,39,46 to 48) Residential (Sectors: 1 to 4, 6,8 to 13)

 

 

 

TARGET AREA

 

KIA Contributes;

·          40% of Leather exports

·          7% of Textile exports

·          78% of Oil refining

·          19% of labor occupation in manufacturing sector

 

 

 

TOTAL UNITS

 

2,571, out of which 1,278 are Industrial Units

 

 

 

WASTEWATER GENERATION

 

100,000 M3/DA Y (High BOD, COD, TSS, Cr, TDS, etc.)

 

 

 

SOLID WASTE GENERATION

 

250 TONS/DAY (High organic, Heavy metal contaminated, Toxic Chemical contaminated wastes).

 

 

 

AIR EMISSION

 

High sax, COx, NOx, Particulate Matter, VOCs

 

 

 

RECOMMENDED APPROACH

 

Integrated approactl, comprising of;

·          Solid Waste Management

·          Occupational Health and Safety

·          Upgradation of Infrastructure Facilities

·          Treatment Facilities

 

 

 

RECOMMENDED PROGRAM

 

Phase I: (Two Years; 1999 -2000)

 

I. At KATI Level

·          Development of KIA Development Trust.

·          Formation of Sub-committees.

·          Hiring of Consultants.

·          Dissemination & Communication

·          Institutional Networking

·          Techno-economic Study

·          Funding arrangements

 

II. Individual Industry Level

·          Initial Environmental Examination of all industries

·          Environmental Audits of Representative Industries

·          Implementation of In-house Improvement Measures

·          Area Greening Program

·          Labour Uplift & On-Job Training

 

III. Cluster Level

·          Final amendments in Land Use master Plan

·          Immediate ban on solid waste dumping and burning

·          Interim solid waste management program

·          Installation of Guide maps, name plates etc.

 

Phase II: (Two Years; 2001 -2002)

·          Installation of Chemical Recovery Plants

·          Pretreatment in Individual Units

·          Construction of Wastewater Conveyance System

·          Repair of Roads

·          Implementation of Hazard management Plan

·          Detailed Designing of Wastewater Treatment Plant

 

Phase III: (Three Years; 2003 -2005)

Construction of the wastewater treatment plant

 

 

 

ESTIMATED COST

 

Rupees 3,397 Million

 

 
Theme


HEAD OFFICE

Perfect Site, 21 KM Off: Ferozepur Road, Near Masjid-e-Ibrahim, Lahore - Pakistan
Tel: +92(0)42 5274527 – 30, Fax: +92(0)42 5274526  Email: necnorth@nec.compk

Copyright 2004-2007 NEC Consultants (Pvt)Ltd. 
Web Site is best viewed in 1024X768 Resolutions, with MS Internet Explore