Combined Effluent Treatment
Plant (CETP) for Korangi Tanneries for PTA(SZ) Environmental
Society
Treatment capacity 42,500 m3/day. Anaerobic treatment technology
with post aerobic treatment for polishing and process scheme
include screen, grit chamber, equalization, sedimentation, UASB,
Aerated Lagoon and Sludge thickening and drying
Combined Effluent Treatment Plant (CETP) for Sundar
Industrial Estate
Treatment capacity 150,000 m3/day. Sundar Industrial Estate is
newly developed industrial estate with a gross area of about 540
hectares, is located at a travel distance of about 26 km, from
Thokar Niaz Baig, Lahore. All the industrial plots have already
been allotted to the applicant industries. PIE has decided to
undertake, parallel to the other infrastructure facilities, the
construction of a Combined Effluent Treatment Plant (CETP), for
the estate, at an already allocated site, located in the south
of the estate.
Wastewater Treatment Plant for Akhtar Textile Industries
Treatment capacity 500 m3/day. Aerobic Treatment technology with
post chemical oxidation and process scheme include
coagulation-flocculation, sedimentation tank, Aeration basin,
sludge thickener and sludge drying. Secondary treatment facility
is in construction phase
Wastewater Treatment Plant at Dewan Farooq Motors Limited
Treatment capacity 225 m3/day. Physico-chemical Treatment with
coagulation flocculation followed by sedimentation and
filtration. Sludge treatment includes thickening and drying.
Wastewater Treatment Plant for Dada Enterprise
Treatment capacity 1,000 m3/day. Aerobic Treatment technology
and process scheme include equalization basin, sedimentation
tank, Aeration basin, sludge thickener and sludge drying.
Secondary treatment facility is in construction phase
Wastewater Treatment Plant for Siddique Leather Works
Treatment capacity 1,500 m3/day. Aerobic Treatment technology
and process scheme include equalization basin, sedimentation
tank, Aeration basin, sludge thickener and sludge drying.
Secondary treatment facility is in construction phase
Wastewater Treatment Plant for East Pakistan Chrome Tannery
Treatment capacity 2,400 m3/day. Aerobic Treatment technology
and process scheme include equalization basin, sedimentation
tank, Aeration basin, sludge thickener and sludge drying.
Secondary treatment facility is in construction phase
Wastewater Treatment Plant for Royal Leather Industries
Treatment capacity 1,500 m3/day. Aerobic Treatment technology
and process scheme include equalization basin, sedimentation
tank, Aeration basin, sludge thickener and sludge drying.
Secondary treatment facility is in construction phase
Wastewater Treatment Plant at HMB
Treatment capacity 1,200 m3/day. Aerobic Treatment technology
and process scheme include equalization basin, sedimentation
tank, Aeration basin, sludge thickener and sludge drying.
Secondary treatment facility is in construction phase
Primary Treatment Plant for Mohammad Shafi Tannery
Treatment capacity 1,200 m3/day. Process element include screen,
equalization tank, sedimentation tank, sludge thickener and
sludge drying
Primary Treatment Plant for Hafeez Shafi Tannery
Treatment capacity 1,200 m3/day. Process element include screen,
equalization tank, sedimentation tank, sludge thickener and
sludge drying
Primary Treatment Plant for Eastern Leather Company
Treatment capacity 1,600 m3/day. Process element include screen,
equalization tank, sedimentation tank, sludge thickener and
sludge drying
Primary Treatment Plant for National Tannery
Treatment capacity 1,200 m3/day. Process element include screen,
equalization tank, sedimentation tank, sludge thickener and
sludge drying
Primary Treatment Plant for
General Leather
Treatment capacity 1,200 m3/day. Process element include screen,
equalization tank, sedimentation tank, sludge thickener and
sludge drying
Primary Treatment Plant for Din
Leathers
Treatment capacity 600 m3/day. Process element include screen,
equalization tank, sedimentation tank, sludge thickener and
sludge drying
Primary Treatment Plant for
Hafeez Tannery
Treatment capacity 100 m3/day. Process element include screen,
equalization tank, sedimentation tank, sludge thickener and
sludge drying
Primary Treatment Plant for
Latif Tannery
Treatment capacity 200 m3/day. Process element include screen,
equalization tank, sedimentation tank, sludge thickener and
sludge drying
Primary Treatment Plant for
Yousuf Tannery
Treatment capacity 200 m3/day. Process element include screen,
equalization tank, sedimentation tank, sludge thickener and
sludge drying
Primary Treatment Plant for
Abson diffusion (Pvt.) Ltd.
Treatment capacity 2,000 m3/day. Process element include screen,
equalization tank, sedimentation tank, sludge thickener and
sludge drying
|