Title Description

Services Offered

Combined Effluent Treatment Plant (CETP) for Korangi Tanneries Treatment capacity 42,000 m3/day. Anaerobic treatment technology with post aerobic treatment for polishing and process scheme include screen, grit chamber, equalization, sedimentation, UASB, Aerated Lagoon and Sludge thickening and drying. - Wastewater monitoring and measurement
- Process and hydraulic design
- Detailed engineering
- Tender documents
- Construction supervision
- Commissioning and startup
- Training of staff
 
Combined Effluent Treatment Plant (CETP) at Sundar Industrial Estate, Lahore Estimated capacity 150,000 m3/day. Treated effluent is required to meet NEQS and will be discharged to Ravi river through Ruhi nullah. The plant is under design phase. - Process and hydraulic design
- Detailed engineering
- Tender documents
- Construction supervision
- Commissioning and start-up
- Training of staff
 
Combined Effluent Treatment Plant (CETP) at Korangi Creek Industrial Park, Karachi Estimated capacity 13,600 m3/day. Treated effluent is required to meet NEQS and will be discharged to Creek nullah through Dike. The plant is under design phase. - Process and hydraulic design
- Detailed engineering
- Tender documents
- Construction supervision
- Commissioning and start-up
- Training of staff
 
Combined Effluent Treatment Plant (CETP) at M-3 Industrial City, Faisalabad Faisalabad Industrial Estate Development & Management Company (FIEDMC), with a gross area of about 1523 hectares, is located adjacent to M-3 Motorway at a distance of 22KM from Faisalabad. FIEDMC has decided to undertake, parallel to the other infrastructure facilities, the construction of a Combined Effluent Treatment Plant (CETP) and Solid Waste Management, for the estate, at an already allocated site. The treatment capacity of plant is around 400,000 m3/day. The proposed Combined Effluent Treatment Plant Site with an area of 24.84 hectares is designated within the estate. - Basic Secondary Data Collection
- Physical and topographical surveys
- Subsoil surveys and geo-technical Investigation
- Feasibility Study Report
- Initial Environmental Examination
- Detailed Engineering design and tender-contract documents
- Tender contract documents
- Engineer’s Cost Estimate
- Process Design Report
- Construction Drawings
- Operational and Maintenance Manual
- In-house Pollution Reduction Measures (IPRM) Guideline Manual
- Contractor’s Pre-qualification Services
- Bid Evaluation Services
- Construction Supervision Services
- Supervision of Plant Start-up and Commissioning
- Solid Waste Management Scheme
 
Wastewater Treatment Plant at Al-Karam Textile Mills (Private) Limited Treatment capacity 5000 m3/day. Aerobic Treatment technology with post chemical oxidation and process scheme include sedimentation tank, Aeration basin (Activated Sludge Process), sludge thickener and sludge drying. - Wastewater monitoring and measurement
- Process and hydraulic design
- Detailed engineering
- Tender documents
- Construction supervision
- Commissioning and startup
- Training of staff
 
Wastewater Treatment Plant at Akhtar Textile Industries Treatment capacity 500 m3/day. Aerobic Treatment technology with post chemical oxidation and process scheme include coagulation-flocculation, sedimentation tank, Aeration basin, sludge thickener and sludge drying. Secondary treatment. - Wastewater monitoring and measurement
- Process and hydraulic design
- Detailed engineering
- Tender documents
- Construction supervision
- Commissioning and startup
- Training of staff
 
Wastewater Treatment Plant at Dewan Farooq Motors, Limited Treatment capacity 225 m3/day. Physico-chemical Treatment with coagulation flocculation followed by sedimentation and filtration. Sludge treatment includes thickening and drying. - Wastewater monitoring and measurement
- Process and hydraulic design
- Detailed engineering
- Tender documents
- Construction supervision
- Commissioning and startup
- Training of staff
 
Wastewater Treatment Plant at Dada Enterprises Limited, Karachi Treatment capacity 1,000 m3/day. Aerobic Treatment technology and process scheme include equalization basin, sedimentation tank, Aeration basin, sludge thickener and sludge drying. Secondary treatment. - Wastewater monitoring and measurement
- Process and hydraulic design
- Detailed engineering
- Tender documents
- Construction supervision
- Commissioning and startup
- Training of staff
 
Wastewater Treatment Plant at Siddique Leather Works, Sheikhupura Treatment capacity 1,500 m3/day. Aerobic Treatment technology and process scheme include equalization basin, sedimentation tank, aeration basin, sludge thickener and sludge drying. Secondary treatment. - Wastewater monitoring and measurement
- Process and hydraulic design
- Detailed engineering
- Tender documents
- Construction supervision
- Commissioning and startup
- Training of staff
Wastewater Treatment Plant at East Pakistan Chrome Tannery, Lahore Treatment capacity 2,400 m3/day. Aerobic Treatment technology and process scheme include equalization basin, sedimentation tank, Aeration basin, sludge thickener and sludge drying. - Wastewater monitoring and measurement
- Process and hydraulic design
- Detailed engineering
- Tender documents
- Construction supervision
- Commissioning and startup
- Training of staff
 
Wastewater Treatment Plant at Royal Leather Industries, Lahore Treatment capacity 1,500 m3/day.  Aerobic Treatment technology and process scheme include equalization basin, sedimentation tank, Aeration basin, sludge thickener and sludge drying. Secondary treatment. - Wastewater monitoring and measurement
- Process and hydraulic design
- Detailed engineering
- Tender documents
- Construction supervision
- Commissioning and startup
- Training of staff
 
Wastewater Treatment Plant at HMB Tanneries Pvt. Limited, Lahore Treatment capacity 1,200 m3/day. Aerobic Treatment technology and process scheme include equalization basin, sedimentation tank, Aeration basin, sludge thickener and sludge drying. Secondary treatment. - Wastewater monitoring and measurement
- Process and hydraulic design
- Detailed engineering
- Tender documents
- Construction supervision
- Commissioning and startup
- Training of staff
 
Primary Treatment Plant at Mohammad Shafi Tannery, Karachi Treatment capacity 1,200 m3/day. Process element includes screen, equalization tank, sedimentation tank, sludge thickener and sludge drying. - Wastewater monitoring and measurement
- Process and hydraulic design
- Detailed engineering
- Tender documents
- Construction supervision
- Commissioning and startup
- Training of staff
 
Primary Treatment Plant at Hafiz Tannery Pvt. Limited, Lahore Treatment capacity 1,200 m3/day. Process element includes screen, equalization tank, sedimentation tank, sludge thickener and sludge drying. - Wastewater monitoring and measurement
- Process and hydraulic design
- Detailed engineering
- Commissioning and startup
- Training of staff
 
Primary Treatment Plant at Eastern Leather Company, Lahore Treatment capacity 1,600 m3/day. Process element includes screen, equalization tank, sedimentation tank, sludge thickener and sludge drying. - Wastewater monitoring and measurement
- Process and hydraulic design
- Detailed engineering
- Commissioning and startup
- Training of staff
 
Primary Treatment Plant at National Tannery Limited, Lahore Treatment capacity 1,200 m3/day. Process element includes screen, equalization tank, sedimentation tank, sludge thickener and sludge drying.
 
- Wastewater monitoring and measurement
- Process and hydraulic design
- Detailed engineering
- Commissioning and startup
- Training of staff
 
Primary Treatment Plant at General Leather Pvt. Limited
 
Treatment capacity 1,200 m3/day. Process element includes screen, equalization tank, sedimentation tank, sludge thickener and sludge drying.
 
- Wastewater monitoring and measurement
- Process and hydraulic design
- Detailed engineering
- Commissioning and startup
- Training of staff
 
Primary Treatment Plant at Din Leather, Karachi
 
Treatment capacity 600 m3/day. Process element includes screen, equalization tank, sedimentation tank, sludge thickener and sludge drying.
 
- Wastewater monitoring and measurement
- Process and hydraulic design
- Detailed engineering
- Commissioning and startup
- Training of staff
 
Primary Treatment Plant at Hafiz Tannery, Lahore Treatment capacity 100 m3/day. Process element includes screen, equalization tank, sedimentation tank, sludge thickener and sludge drying.
 
- Wastewater monitoring and measurement
- Process and hydraulic design
- Detailed engineering
- Commissioning and startup
- Training of staff
 
Primary Treatment Plant at Latif Tannery, Sahiwal
 
Treatment capacity 200 m3/day. Process element includes screen, equalization tank, sedimentation tank, sludge thickener and sludge drying.
 
- Wastewater monitoring and measurement
- Process and hydraulic design
- Detailed engineering
- Commissioning and startup
- Training of staff
 
Primary Treatment Plant at Yourself Tannery Pvt. Limited, Lahore
 
Treatment capacity 200 m3/day. Process element includes screen, equalization tank, sedimentation tank, sludge thickener and sludge drying.
 
- Wastewater monitoring and measurement
- Process and hydraulic design
- Detailed engineering
- Commissioning and startup
- Training of staff
 
Primary Treatment Plant at Abson Diffusion Pvt. Limited, Lahore
 
Treatment capacity 2,000 m3/day. Process element includes screen, equalization tank, sedimentation tank, sludge thickener and sludge drying.
 
- Wastewater monitoring and measurement
- Process and hydraulic design
- Detailed engineering
- Commissioning and startup
- Training of staff
 
Waste water Treatment Plant at New Snack Manufacturing Facility, Pepsico, Lahore
 
Treatment capacity 700 m3/day. Process element include manually cleaned screen, mechanically cleaned screen, drum screen, primary settling tank, equalization tank, UASB reactor, Aeration tank, Secondary settling tank, sludge thickener and sludge filter (Belt process type).
 
- Wastewater monitoring and measurement
- Process and hydraulic design
- Detailed engineering
- Commissioning and startup
- Training of staff

 


Head Office: Lahore

Perfect Site, 21 KM Off: Ferozepur Road, Near Masjid-e-Ibrahim, Lahore - Pakistan
Tel: +92(42) 35273741-46, Fax: +92(42) 35273750, Email: necnorth@nec.com.pk

Karachi Office:
Mezzanine Floor, Principal House, Plot No. 39C & 41C, 22nd Commercial Street off: Khayaban-e-Ittehad,
Phase-II EXT, DHA, Karachi – 75500, Pakistan
Tel: +92(21) 35893341- 43, Fax: +92(21) 35893340 Email: necsouth@nec.com.pk

Faisalabad Office:
House No. 371 – A, Gulistan Colony No. 1, Ayesha stop, Near Millat Chowk, Faisalabad, Pakistan
Tel: +92(41) 8581816,8785085 Fax: +92(41) 8581295 Email: necfsd@nec.com.pk, Pisd@Nexlinx.Net.Pk

Copyright 2011-2015 NEC Consultants (Pvt)Ltd. 
Web Site is best viewed in 1024X768 Resolutions, with MS Internet Explorer and Mozilla FireFox
    , Raghib Khesal, Raghib